Passage Data · Check a report · Use it from your AI

Mathews Company

Farm Machinery And Equipment, Crystal Lake, Illinois. NPDES permit IL0072851, in force until Sep 30, 2030. Last 12 months: no values over a limit, 10 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 25 days after each period: form 0 monthly (5 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 8 of 12 reports late

Limits in force (6)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitmonthly maximum≤ 63 deg FJan, Feb, Mar, Dec
Temperature, water deg. fahrenheitmonthly maximum≤ 93 deg FApr–Nov
pHmonthly minimum≥ 6.5 SUall year
pHmonthly maximum≤ 9 SUall year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year

How strict are these limits?

Cited limits by parameter: Illinois's rules and the federal ones.

Same industry: the 11 Industrial and Commercial Machinery and Computer Equipment permits in Illinois.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/IL0072851 · MCP: https://passage-data.com/mcp