Passage Data · Check a report · Use it from your AI
Fluid Power Valves & Hose Fittings, Carpentersville, Illinois. NPDES permit IL0071340, in force until Oct 31, 2027. Last 12 months: no values over a limit, 1 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| pH | monthly minimum | ≥ 6 SU | all year |
| pH | monthly maximum | ≤ 9 SU | all year |
| 1,2-cis-Dichloroethene | 30-day average | report only (mg/L) | all year |
| 1,2-cis-Dichloroethene | daily maximum | report only (mg/L) | all year |
| Flow, in conduit or thru treatment plant | monthly average | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| Tetrachloroethene | 30-day average | ≤ .052 mg/L | all year |
| Tetrachloroethene | daily maximum | ≤ .164 mg/L | all year |
| Tetrachloroethene | 30-day average | ≤ .05 lb/d | all year |
| Tetrachloroethene | daily maximum | ≤ .182 lb/d | all year |
| Trichloroethene | 30-day average | ≤ .016 mg/L | all year |
| Trichloroethene | daily maximum | ≤ .069 mg/L | all year |
| Trichloroethene | 30-day average | ≤ .025 lb/d | all year |
| Trichloroethene | daily maximum | ≤ .076 lb/d | all year |
Cited limits by parameter: Illinois's rules and the federal ones.
Same industry: the 8 Fabricated Metal Products permits in Illinois.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/IL0071340 · MCP: https://passage-data.com/mcp