Passage Data · Check a report · Use it from your AI

Kootenai Tribe of Idaho

Hunting, Trapping, Game Propagation, Bonners Ferry, Idaho. NPDES permit ID0028291 expired Jun 2, 2011; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 20 days after each period: form A monthly (16 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 4 reports late

Limits in force (16)

ParameterStatisticLimitMonths
Flow ratemonthly averagereport only (ft3/d)Jun–Sep
Flow ratedaily maximumreport only (ft3/d)Jun–Sep
Flow ratemonthly averagereport only (ft3/d)Jun–Sep
Flow ratedaily maximumreport only (ft3/d)Jun–Sep
Nitrogen, total [as N]monthly averagereport only (lb/d)Jun–Sep
Nitrogen, total [as N]daily maximumreport only (lb/d)Jun–Sep
Nitrogen, ammonia total [as N]monthly averagereport only (lb/d)Jun–Sep
Nitrogen, ammonia total [as N]daily maximumreport only (lb/d)Jun–Sep
Phosphorus, total [as P]monthly averagereport only (lb/d)Jun–Sep
Phosphorus, total [as P]daily maximumreport only (lb/d)Jun–Sep
Dilution factordaily average minimumreport only (Ratio)Jun–Sep
Dilution factormonthly averagereport only (Ratio)Jun–Sep
Dilution factordaily maximumreport only (Ratio)Jun–Sep
Dilution factordaily average minimumreport only (Ratio)Jun–Sep
Dilution factormonthly average minimum≥ 53000000 RatioJun–Sep
Dilution factordaily maximumreport only (Ratio)Jun–Sep

Cited limits by parameter: Idaho's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ID0028291 · MCP: https://passage-data.com/mcp