Passage Data · Check a report · Use it from your AI

City of Eldon

Sewage treatment plant, Eldon, Iowa. NPDES permit IA0022306, in force until Apr 30, 2030. Last 12 months: over a limit 5 times (last June 2026), 4 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (17 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
7 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
April 2026E. coli, geometric mean2420≤ 126 #/100mL1821%
June 2026BOD, carbonaceous [5 day, 20 C], 30-day average29≤ 25 mg/L16%
June 2026E. coli, geometric mean1258≤ 126 #/100mL898%
June 2026Solids, total suspended, 30-day average86≤ 80 mg/L8%
June 2026pH, daily maximum9.1≤ 9 SU—

Limits in force (17)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. C30-day averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)all year
BOD, 5-day, 20 deg. C30-day averagereport only (lb/d)all year
BOD, 5-day, 20 deg. Cdaily maximumreport only (lb/d)all year
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
pH30-day averagereport only (SU)all year
pHdaily maximumreport only (SU)all year
Solids, total suspended30-day average≤ 80 mg/Lall year
Solids, total suspended7-day average≤ 120 mg/Lall year
Solids, total suspended30-day averagereport only (mg/L)all year
Solids, total suspendeddaily maximumreport only (mg/L)all year
Solids, total suspended30-day averagereport only (lb/d)all year
Solids, total suspendeddaily maximumreport only (lb/d)all year
E. coligeometric mean≤ 126 #/100mLMar–Nov
BOD, carbonaceous [5 day, 20 C]30-day average≤ 25 mg/Lall year
BOD, carbonaceous [5 day, 20 C]7-day average≤ 40 mg/Lall year

How strict are these limits?

Cited limits by parameter: Iowa's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/IA0022306 · MCP: https://passage-data.com/mcp