Passage Data · Check a report · Use it from your AI

Plantation Pipe Line Company

Refined Petroleum Pipelines, Bremen, Georgia. NPDES permit GA0030945 expired Jan 31, 2025; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 46 days after each period: outfall 001 form A1 monthly (10 values), outfall 002 form A1 monthly (8 values), outfall 003 form A1 monthly (8 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 36 reports late

Limits in force (26)

ParameterStatisticLimitMonthsOutfall
pHminimum≥ 6 SUall year001
pHmaximum≤ 8.5 SUall year001
Phosphorus, total [as P]daily averagereport only (mg/L)all year001
Phosphorus, total [as P]daily maximumreport only (mg/L)all year001
Iron, total [as Fe]daily averagereport only (mg/L)all year001
Iron, total [as Fe]daily maximumreport only (mg/L)all year001
Oil and greasedaily average≤ 10 mg/Lall year001
Oil and greasedaily maximum≤ 15 mg/Lall year001
Flow, in conduit or thru treatment plantdaily averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
pHminimum≥ 6 SUall year002
pHmaximum≤ 8.5 SUall year002
Phosphorus, total [as P]daily averagereport only (mg/L)all year002
Phosphorus, total [as P]daily maximumreport only (mg/L)all year002
Oil and greasedaily average≤ 10 mg/Lall year002
Oil and greasedaily maximum≤ 15 mg/Lall year002
Flow, in conduit or thru treatment plantdaily averagereport only (MGD)all year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002
pHminimum≥ 6 SUall year003
pHmaximum≤ 8.5 SUall year003
Phosphorus, total [as P]daily averagereport only (mg/L)all year003
Phosphorus, total [as P]daily maximumreport only (mg/L)all year003
Oil and greasedaily average≤ 10 mg/Lall year003
Oil and greasedaily maximum≤ 15 mg/Lall year003
Flow, in conduit or thru treatment plantdaily averagereport only (MGD)all year003
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year003

How strict are these limits?

Cited limits by parameter: Georgia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/GA0030945 · MCP: https://passage-data.com/mcp