Passage Data · Check a report · Use it from your AI

Armstrong World Industries

Manufacturing Industries, Macon, Georgia. NPDES permit GA0003077, in force until Aug 31, 2027. Last 12 months: over a limit 9 times (last September 2026), 3 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form 1 monthly (12 values)
Renewal application due
Mar 4, 2027 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 2 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
January 2026BOD, 5-day, 20 deg. C, daily maximum270 mg/L≤ 263 mg/L3%
March 2026Solids, total suspended, daily average23.6 mg/L≤ 23 mg/L3%
April 2026Solids, total suspended, daily maximum57.2 mg/L≤ 35 mg/L63%
May 2026Solids, total suspended, daily maximum45.6 mg/L≤ 35 mg/L30%
June 2026Solids, total suspended, daily average35.4 mg/L≤ 23 mg/L54%
June 2026Solids, total suspended, daily maximum112 mg/L≤ 35 mg/L220%
July 2026Solids, total suspended, daily average32.1 mg/L≤ 23 mg/L40%
July 2026Solids, total suspended, daily maximum116 mg/L≤ 35 mg/L231%
September 2026Solids, total suspended, daily maximum39.4 mg/L≤ 35 mg/L13%

Limits in force (12)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
Oxygen, dissolved [DO]minimum≥ 6 mg/Lall year
BOD, 5-day, 20 deg. Cdaily average≤ 175 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 263 lb/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendeddaily average≤ 23 mg/Lall year
Solids, total suspendeddaily maximum≤ 35 mg/Lall year
Phosphorus, total [as P]daily averagereport only (mg/L)all year
Phosphorus, total [as P]daily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantdaily averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year

How strict are these limits?

Cited limits by parameter: Georgia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/GA0003077 · MCP: https://passage-data.com/mcp