Passage Data · Check a report · Use it from your AI
Crushed And Broken Stone, Jacksonville, Florida. NPDES permit FL0971995, in force until Nov 27, 2027. Last 12 months: no values over a limit, 103 required values missing, 8 of 14 reports late. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. centigrade | maximum | report only (deg C) | all year |
| Turbidity | maximum | report only (NTU) | all year |
| Turbidity | maximum | report only (NTU) | all year |
| Turbidity | maximum | report only (NTU) | all year |
| Turbidity | maximum | ≤ 0 NTU | all year |
| Specific conductance | maximum | report only (umho/cm) | all year |
| Oxygen, dissolved [DO] | minimum | ≥ 5 mg/L | all year |
| pH | minimum | ≥ 6.5 SU | all year |
| pH | maximum | ≤ 8.5 SU | all year |
| Solids, total suspended | maximum | report only (mg/L) | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Oil & Grease | maximum | ≤ 5 mg/L | all year |
| Nitrogen, total [as N] | maximum | report only (mg/L) | all year |
| Nitrogen, total [as N] | monthly average | report only (mg/L) | all year |
| Nitrogen, total [as N] | monthly total | report only (lb/mo) | all year |
| Nitrogen, total [as N] | annual total | ≤ 10 lb/yr | all year |
| Phosphorus, total [as P] | maximum | report only (mg/L) | all year |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | all year |
| Phosphorus, total [as P] | monthly total | report only (lb/mo) | all year |
| Phosphorus, total [as P] | annual total | ≤ 6 lb/yr | all year |
| Iron, total recoverable | maximum | ≤ .3 mg/L | all year |
| Aluminum, total recoverable | maximum | ≤ 1.5 mg/L | all year |
| Lead, total recoverable | maximum | ≤ 8.5 ug/L | all year |
| Copper, total recoverable | maximum | ≤ 3.7 ug/L | all year |
| Flow, in conduit or thru treatment plant | monthly average | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | annual average | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .07 MGD | all year |
| Flow, in conduit or thru treatment plant | annual average | report only (MGD) | all year |
| Mercury, total recoverable | maximum | ≤ .025 ug/L | all year |
| LC50 Static Renewal 96Hr Acute Americamysis bahia (formerly Mysidopsis bahia) | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Americamysis bahia (formerly Mysidopsis bahia) | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Americamysis bahia (formerly Mysidopsis bahia) | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Menidia | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Menidia | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Menidia | minimum | ≥ 100 % | all year |
Cited limits by parameter: Florida's rules and the federal ones.
Same industry: the 22 Mining and Quarrying of Nonmetallic Minerals permits in Florida.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/FL0971995 · MCP: https://passage-data.com/mcp