Passage Data · Check a report · Use it from your AI

CEMEX Construction Materials Florida LLC

Clay And Related Minerals, Bushnell, Florida. NPDES permit FL0135372, in force until Jan 5, 2029. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 90 days after each period: outfall 001 form 1 monthly (16 values), outfall 002 form 1 monthly (16 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 24 reports late

Limits in force (32)

ParameterStatisticLimitMonthsOutfall
Turbiditydaily maximumreport only (NTU)all year001
Specific conductancedaily maximumreport only (umho/cm)all year001
pHdaily minimum≥ 6 SUall year001
pHdaily maximum≤ 8.5 SUall year001
Oil & Greasedaily maximum≤ 5 mg/Lall year001
Hardness, total [as CaCO3]daily maximumreport only (mg/L)all year001
Sodium, total recoverabledaily maximumreport only (mg/L)all year001
Chloride [as Cl]daily maximumreport only (mg/L)all year001
Sulfate, total [as SO4]daily maximumreport only (mg/L)all year001
Fluoride, total [as F]daily maximumreport only (mg/L)all year001
Aluminum, total recoverabledaily maximumreport only (mg/L)all year001
Lead, total recoverabledaily maximumreport only (mg/L)all year001
Lead, total recoverabledaily maximumreport only (mg/L)all year001
Lead, total recoverabledaily maximum≤ 0 mg/Lall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Turbiditydaily maximumreport only (NTU)all year002
Specific conductancedaily maximumreport only (umho/cm)all year002
pHdaily minimum≥ 6 SUall year002
pHdaily maximum≤ 8.5 SUall year002
Oil & Greasedaily maximum≤ 5 mg/Lall year002
Hardness, total [as CaCO3]daily maximumreport only (mg/L)all year002
Sodium, total recoverabledaily maximumreport only (mg/L)all year002
Chloride [as Cl]daily maximumreport only (mg/L)all year002
Sulfate, total [as SO4]daily maximumreport only (mg/L)all year002
Fluoride, total [as F]daily maximumreport only (mg/L)all year002
Aluminum, total recoverabledaily maximumreport only (mg/L)all year002
Lead, total recoverabledaily maximumreport only (ug/L)all year002
Lead, total recoverabledaily maximumreport only (ug/L)all year002
Lead, total recoverabledaily maximum≤ 0 ug/Lall year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002

How strict are these limits?

Cited limits by parameter: Florida's rules and the federal ones.

Same industry: the 22 Mining and Quarrying of Nonmetallic Minerals permits in Florida.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/FL0135372 · MCP: https://passage-data.com/mcp