Passage Data · Check a report · Use it from your AI

FPL Riviera Plant

Electric Services, major discharger, Riviera Beach, Florida. NPDES permit FL0001546, in force until Aug 17, 2027. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 90 days after each period: outfall 013 form 1 monthly (9 values), outfall 013 form Q quarterly (2 values), outfall 015 form 1 monthly (3 values), outfall 017 form 1 monthly (2 values), outfall 017 form Q quarterly (6 values), outfall 018 form 1 monthly (2 values), and 4 more forms
Renewal application due
Feb 18, 2027 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 65 reports late

Limits in force (48)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. fahrenheitdaily averagereport only (deg F)all year013
Temperature, water deg. fahrenheitmaximum monthly averagereport only (deg F)all year013
Nitrogen, total [as N]rolling averagereport only (lb/yr)all year013
Phosphorus, total [as P]rolling average≤ 412 lb/yrall year013
Copper, total recoverablemonthly averagereport only (ug/L)all year013
Copper, total recoverablemonthly averagereport only (ug/L)all year013
Oxidants, total residualmonthly average≤ .01 mg/Lall year013
Oxidants, total residualdaily maximum≤ .01 mg/Lall year013
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year013
Flow, in conduit or thru treatment plantinstantaneous maximumreport only (MGD)all year013
Temp. diff. between intake and dischargedaily averagereport only (deg F)all year013
Temp. diff. between intake and dischargemaximum monthly averagereport only (deg F)all year013
Chlorination durationinstantaneous maximum≤ 120 min/dall year013
IC25 Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia)minimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia)minimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia)minimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia)minimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia)minimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia)minimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Menidia menidiaminimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Menidia menidiaminimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Menidia menidiaminimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Menidia menidiaminimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Menidia menidiaminimum≥ 100 %all year013
IC25 Static Renewal 7 Day Chronic Menidia menidiaminimum≥ 100 %all year013
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year015
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year015
Chlorination durationinstantaneous maximum≤ 1440 min/dall year015
pHinstantaneous minimum≥ 6 SUall year017
pHinstantaneous maximum≤ 9 SUall year017
Solids, total suspendedmonthly average≤ 30 mg/Lall year017
Solids, total suspendeddaily maximum≤ 100 mg/Lall year017
Oil & Greasemonthly average≤ 15 mg/Lall year017
Oil & Greasedaily maximum≤ 20 mg/Lall year017
Nitrogen, total [as N]maximumreport only (mg/L)all year017
Phosphate, ortho [as PO4]maximumreport only (mg/L)all year017
Phosphorus, total [as P]maximumreport only (mg/L)all year017
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year017
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year017
Solids, total suspendedmonthly average≤ 30 mg/Lall year018
Solids, total suspendeddaily maximum≤ 100 mg/Lall year018
Oil & Greasemonthly average≤ 15 mg/Lall year018
Oil & Greasedaily maximum≤ 20 mg/Lall year018
Nitrogen, total [as N]maximumreport only (mg/L)all year018
Phosphate, ortho [as PO4]maximumreport only (mg/L)all year018
Phosphorus, total [as P]maximumreport only (mg/L)all year018
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year018
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year018

How strict are these limits?

Cited limits by parameter: Florida's rules and the federal ones.

Same industry: the 30 Electric Services permits in Florida.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/FL0001546 · MCP: https://passage-data.com/mcp