Passage Data · Check a report · Use it from your AI

Firstlight CT Hydro LLC

Industrial or other facility, Taftville, Connecticut. NPDES permit CT0030815, in force until Nov 30, 2029. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 30 days after each period: outfall 001 form 1 monthly (4 values), outfall 002 form 1 monthly (4 values)
Last report on file
March 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 2 of 4 reports late

Limits in force (8)

ParameterStatisticLimitMonthsOutfall
pHinstantaneous minimum≥ 6.5 SUMar, Sep001
pHinstantaneous maximum≤ 8 SUMar, Sep001
Oil & Greaseinstantaneous maximumreport only (mg/L)Mar, Sep001
Flowdaily maximum≤ 34560 gal/dMar, Sep001
pHinstantaneous minimum≥ 6.5 SUMar, Sep002
pHinstantaneous maximum≤ 8 SUMar, Sep002
Oil & Greaseinstantaneous maximumreport only (mg/L)Mar, Sep002
Flowdaily maximum≤ 34560 gal/dMar, Sep002

How strict are these limits?

Cited limits by parameter: Connecticut's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/CT0030815 · MCP: https://passage-data.com/mcp