Passage Data · Check a report · Use it from your AI

Firstlight CT Hydro LLC

Industrial or other facility, Colebrook, Connecticut. NPDES permit CT0030812, in force until Aug 31, 2029. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 31 days after each period: outfall 101 form 1 monthly (4 values), outfall 102 form 1 monthly (4 values)
Last report on file
March 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 4 reports late

Limits in force (8)

ParameterStatisticLimitMonthsOutfall
pHinstantaneous minimum≥ 6.5 SUMar, Sep101
pHinstantaneous maximum≤ 8 SUMar, Sep101
Oil & Greaseinstantaneous maximumreport only (mg/L)Mar, Sep101
Flow, maximum during 24 hr perioddaily maximum≤ 3000 gal/dMar, Sep101
pHinstantaneous minimum≥ 6.5 SUMar, Sep102
pHinstantaneous maximum≤ 8 SUMar, Sep102
Oil & Greaseinstantaneous maximumreport only (mg/L)Mar, Sep102
Flow, maximum during 24 hr perioddaily maximum≤ 3000 gal/dMar, Sep102

How strict are these limits?

Cited limits by parameter: Connecticut's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/CT0030812 · MCP: https://passage-data.com/mcp