Passage Data · Check a report · Use it from your AI

Marion, City of

Sewage treatment plant, major discharger, Marion, Arkansas. NPDES permit AR0021971, in force until Dec 31, 2028. Last 12 months: over a limit 10 times (last July 2026), 28 required values missing, 5 of 16 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 25 days after each period: outfall 002 form A monthly (14 values), outfall TX2 form Q quarterly (12 values), outfall 002 form Y yearly
Last report on file
September 2026
Oct 2024 – Sep 2025
8 values over a limit, 40 required values missing, 4 of 17 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025BOD, 5-day, 20 deg. C, 7-day average67.6 mg/L≤ 45 mg/L50%
October 2025BOD, 5-day, 20 deg. C, 7-day average67.6 mg/L≤ 45 mg/L50%
October 2025BOD, 5-day, 20 deg. C, monthly average42.5 mg/L≤ 30 mg/L42%
October 2025BOD, 5-day, 20 deg. C, monthly average42.5 mg/L≤ 30 mg/L42%
January 2026BOD, 5-day, 20 deg. C, 7-day average68.7 mg/L≤ 45 mg/L53%
January 2026BOD, 5-day, 20 deg. C, monthly average46.83 mg/L≤ 30 mg/L56%
April 2026BOD, 5-day, 20 deg. C, 7-day average49.3 mg/L≤ 45 mg/L10%
April 2026BOD, 5-day, 20 deg. C, monthly average31.92 mg/L≤ 30 mg/L6%
July 2026BOD, 5-day, 20 deg. C, 7-day average47 mg/L≤ 45 mg/L4%
July 2026BOD, 5-day, 20 deg. C, monthly average32.7 mg/L≤ 30 mg/L9%

Limits in force (32)

ParameterStatisticLimitMonthsOutfall
Oxygen, dissolved [DO]instantaneous minimum≥ 2 mg/Lall year002
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year002
BOD, 5-day, 20 deg. C7-day average≤ 45 mg/Lall year002
pHminimum≥ 6 SUall year002
pHmaximum≤ 9 SUall year002
Solids, total suspendedmonthly average≤ 90 mg/Lall year002
Solids, total suspended7-day average≤ 135 mg/Lall year002
Nitrite + Nitrate total [as N]monthly averagereport only (mg/L)all year002
Nitrite + Nitrate total [as N]7-day averagereport only (mg/L)all year002
Phosphorus, total [as P]monthly averagereport only (mg/L)all year002
Phosphorus, total [as P]7-day averagereport only (mg/L)all year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002
Flow, in conduit or thru treatment plantdaily maximum≤ 4.5 MGDall year002
Chlorine, total residualinstantaneous maximumreport only (mg/L)all year002
Coliform, fecal general30-day geometric mean≤ 200 #/100mLMay–Sep002
Coliform, fecal general30-day geometric mean≤ 1000 #/100mLJan, Feb, Mar, Apr, Oct, Nov, Dec002
Coliform, fecal general7-day geometric mean≤ 400 #/100mLMay–Sep002
Coliform, fecal general7-day geometric mean≤ 2000 #/100mLJan, Feb, Mar, Apr, Oct, Nov, Dec002
Overflowsmonthly totalreport only (occur/mo)all year002
Overflow volume [SS0 volume, CSO volume]monthly totalreport only (gal)all year002
Whole effluent toxicity - retest #148-hour minimumreport only (pass=0;fail=1)all yearTX2
Whole effluent toxicity - retest #248-hour minimumreport only (pass=0;fail=1)all yearTX2
WET, sublethal retest #148-hour minimumreport only (pass=0;fail=1)all yearTX2
WET, sublethal retest #248-hour minimumreport only (pass=0;fail=1)all yearTX2
Whole Effluent Toxicity - Retest #348-hour minimumreport only (pass=0;fail=1)all yearTX2
Whole Effluent Toxicity, Sub-Lethal Retest #348-hour minimumreport only (pass=0;fail=1)all yearTX2
Low Flow Pass/Fail Static Renewal 48Hr Acute Daphnia pulex48-hour minimumreport only (pass=0;fail=1)all yearTX2
LF Pass/Fail Static Renewal 48Hr Acute Pimephales promelas48-hour minimumreport only (pass=0;fail=1)all yearTX2
NOAEC Lethal Statis Renewal 48 Hr Acute Daphnia pulex48-hour minimumreport only (%)all yearTX2
NOAEC Lethal Static Renewal 48Hr acute Pimephales promelas48-hour minimumreport only (%)all yearTX2
Coef Of Var Static Renewal 48Hr Acute D. pulex48-hour minimumreport only (%)all yearTX2
Coef Of Var Static Renewal 48Hr Acute Pimephales promelas48-hour minimumreport only (%)all yearTX2

How strict are these limits?

Cited limits by parameter: Arkansas's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/AR0021971 · MCP: https://passage-data.com/mcp