Passage Data · Check a report · Use it from your AI

CWM Water Authority

Water Supply, Lower Peach Tree, Alabama. NPDES permit AL0084212 expired Jun 30, 2026; its limits still apply. Last 12 months: no values over a limit, 21 required values missing, 2 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form 1 monthly (21 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
12 values over a limit, 65 required values missing, 9 of 12 reports late

Limits in force (21)

ParameterStatisticLimitMonths
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendeddaily maximum≤ 45 mg/Lall year
Phosphorus, total [as P]monthly averagereport only (mg/L)all year
Phosphorus, total [as P]daily maximumreport only (mg/L)all year
Carbon, tot organic [TOC]monthly averagereport only (mg/L)all year
Carbon, tot organic [TOC]daily maximumreport only (mg/L)all year
Carbon, tot organic [TOC]monthly averagereport only (lb/d)all year
Chloride [as Cl]monthly averagereport only (mg/L)all year
Chloride [as Cl]daily maximumreport only (mg/L)all year
Iron, total recoverablemonthly average≤ 6 mg/Lall year
Aluminum, total recoverablemonthly averagereport only (mg/L)all year
Aluminum, total recoverabledaily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly average≤ 1 mg/Lall year
Chlorine, total residualdaily maximum≤ 1 mg/Lall year
Solids, total dissolvedmonthly averagereport only (mg/L)all year
Solids, total dissolveddaily maximumreport only (mg/L)all year
Solids, total dissolvedmonthly averagereport only (lb/d)all year

How strict are these limits?

Cited limits by parameter: Alabama's rules and the federal ones.

Same industry: the 35 Water Supply permits in Alabama.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/AL0084212 · MCP: https://passage-data.com/mcp