Passage Data · Check a report · Use it from your AI

Wiregrass Construction Company, Inc.

Construction Sand And Gravel, Shorter, Alabama. NPDES permit AL0077631, in force until Jun 30, 2031. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 007 form 1 quarterly, outfall 010 form 1 quarterly
Last report on file
June 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 36 reports late

Limits in force (12)

ParameterStatisticLimitMonthsOutfall
pHdaily minimum≥ 6 SUall year007
pHdaily maximum≤ 8.5 SUall year007
Solids, total suspendedmonthly average≤ 27 mg/Lall year007
Solids, total suspendeddaily maximum≤ 54 mg/Lall year007
Flow, in conduit or thru treatment plantdaily minimumreport only (MGD)all year007
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year007
pHdaily minimum≥ 6 SUall year010
pHdaily maximum≤ 8.5 SUall year010
Solids, total suspendedmonthly average≤ 27 mg/Lall year010
Solids, total suspendeddaily maximum≤ 54 mg/Lall year010
Flow, in conduit or thru treatment plantdaily minimumreport only (MGD)all year010
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year010

How strict are these limits?

Cited limits by parameter: Alabama's rules and the federal ones.

Same industry: the 206 Mining and Quarrying of Nonmetallic Minerals permits in Alabama.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/AL0077631 · MCP: https://passage-data.com/mcp