Passage Data · Check a report · Use it from your AI

Alabama Power Company

Electric Services, Billingsley, Alabama. NPDES permit AL0072788 expired Oct 31, 2026. Last 12 months: over a limit once (last April 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 001 form 1 quarterly, outfall 001 form Y yearly, outfall 002 form 1 quarterly, outfall 003 form S twice a year
Last report on file
June 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 27 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
April 2026Chlorine, total residual, daily maximum1.11≤ .056 mg/L1882%

Limits in force (23)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. fahrenheitdaily maximum≤ 95 deg Fall year001
pHdaily minimum≥ 6 SUall year001
pHdaily maximum≤ 9 SUall year001
Phosphorus, total [as P]daily maximumreport only (mg/L)Apr–Oct001
Chromium, total [as Cr]monthly average≤ .2 mg/Lall year001
Chromium, total [as Cr]daily maximum≤ .2 mg/Lall year001
Zinc, total [as Zn]monthly average≤ 1 mg/Lall year001
Zinc, total [as Zn]daily maximum≤ 1 mg/Lall year001
Priority Pollutantsdaily maximum≤ 0 ug/Lall year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Chlorine, total residualdaily maximum≤ .056 mg/Lall year001
pHdaily minimum≥ 6 SUall year002
pHdaily maximum≤ 9 SUall year002
Solids, total suspendedmonthly average≤ 30 mg/Lall year002
Solids, total suspendeddaily maximum≤ 100 mg/Lall year002
Oil & Greasemonthly average≤ 10 mg/Lall year002
Oil & Greasedaily maximum≤ 15 mg/Lall year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002
pHdaily minimumreport only (SU)all year003
pHdaily maximumreport only (SU)all year003
Solids, total suspendeddaily maximumreport only (mg/L)all year003
Oil & Greasedaily maximum≤ 15 mg/Lall year003
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year003

How strict are these limits?

Cited limits by parameter: Alabama's rules and the federal ones.

Same industry: the 23 Electric Services permits in Alabama.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/AL0072788 · MCP: https://passage-data.com/mcp