Passage Data · Check a report · Use it from your AI

Alabama Power Company

Electric Services, Mcintosh, Alabama. NPDES permit AL0071951 expired Sep 30, 2026; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 001 form 1 quarterly (6 values), outfall 001 form Q quarterly (4 values), outfall 01A form Q quarterly (7 values), outfall 001 form Y yearly, outfall 002 form Y yearly
Last report on file
June 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 22 reports late

Limits in force (23)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. fahrenheitdaily maximum≤ 90 deg Fall year001
pHdaily minimum≥ 6 SUall year001
pHdaily maximum≤ 8.5 SUall year001
Zinc, total recoverablemonthly average≤ .198 mg/Lall year001
Zinc, total recoverabledaily maximum≤ .198 mg/Lall year001
Chromium, total recoverablemonthly average≤ .2 mg/Lall year001
Chromium, total recoverabledaily maximum≤ .2 mg/Lall year001
Priority Pollutantsdaily maximum≤ 0 ug/Lall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Chlorine, total residualmonthly average≤ .011 mg/Lall year001
Chlorine, total residualdaily maximum≤ .019 mg/Lall year001
Annual Certification Statementdaily maximum= 0 Y=0;N=1all year001
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year002
pHdaily minimum≥ 6 SUall year002
pHdaily maximum≤ 8.5 SUall year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002
pHdaily minimum≥ 6 SUall year01A
pHdaily maximum≤ 9 SUall year01A
Solids, total suspendedmonthly average≤ 30 mg/Lall year01A
Solids, total suspendeddaily maximum≤ 100 mg/Lall year01A
Oil & Greasemonthly average≤ 15 mg/Lall year01A
Oil & Greasedaily maximum≤ 20 mg/Lall year01A
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year01A

How strict are these limits?

Cited limits by parameter: Alabama's rules and the federal ones.

Same industry: the 23 Electric Services permits in Alabama.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/AL0071951 · MCP: https://passage-data.com/mcp