35 rows for arsenic in this instrument. Every instrument for arsenic in North Dakota
| Parameter | Value | Statistic | Applies when | Cite |
|---|---|---|---|---|
| Arsenic, total | 18 µg/L | daily maximum | discharge to surface water existing sources (BAT) (g) FGD wastewater —(1) 2020 BAT. (i) Except for those discharges to which paragraph (g)(2) or (3) of this section applies, the quantity of pollutants in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in table 5 to this paragraph (g)(1)(i). Dischargers must meet the effluent limitations for FGD wastewater in this … table: Table 5 to Paragraph ( g )(1)( i ) | 40 CFR 423.13 (BAT)Arsenic, total (µg/L) 18 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to surface water existing sources (BAT) (ii) For FGD wastewater discharges from a high FGD flow facility, the quantity of pollutants in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in table 6 to this paragraph (g)(2)(ii). Dischargers must meet the effluent limitations for FGD wastewater in this paragraph (g)(2)(ii) by a date determined by the permitti… table: Table 6 to Paragraph ( g )(2)( ii ) | 40 CFR 423.13 (BAT)Arsenic, total (µg/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 5 µg/L | daily maximum | discharge to surface water existing sources (BAT) (3) Voluntary incentives plan. (i) For dischargers who voluntarily choose to meet the effluent limitations for FGD wastewater in this paragraph (g)(3)(i), the quantity of pollutants in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in table 7 to this paragraph (g)(3)(i). Dischargers who choose to meet the effluent… table: Table 7 to Paragraph ( g )(3)( i ) | 40 CFR 423.13 (BAT)Arsenic, total (ug/L) 5 NA |
| Arsenic, total | 11 µg/L | daily maximum | discharge to surface water existing sources (BAT) (iv) For FGD wastewater discharged from any coal combustion residual surface impoundment which commences closure pursuant to 40 CFR 257.102(e) after July 8, 2024, the quantity of pollutants in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in table 8 to this paragraph (g)(4)(iv). table: Table 8 to Paragraph ( g )(4)( iv ) | 40 CFR 423.13 (BAT)Arsenic, total (µg/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 4 µg/L | daily maximum | discharge to surface water existing sources (BAT) (j)(1)(i) Gasification wastewater. Except for those discharges to which paragraph (j)(2) of this section applies, the quantity of pollutants in gasification wastewater shall not exceed the quantity determined by multiplying the flow of gasification wastewater times the concentration listed in the table following this paragraph (j)(1)(i). Dischargers must meet the effluent limitations in this pa… | 40 CFR 423.13 (BAT)Arsenic, total (ug/L) 4 |
| Arsenic, total | 11 µg/L | daily maximum | discharge to surface water existing sources (BAT) (iv) For bottom ash transport water discharged from any coal combustion residual surface impoundment which commences closure pursuant to 40 CFR 257.102(e) after July 8, 2024, the quantity of pollutants in bottom ash transport water shall not exceed the quantity determined by multiplying the flow of bottom ash transport water times the concentration listed in table 10 to this paragraph (k)(4)(iv). table: Table 10 to Paragraph (k)(4)(iv) | 40 CFR 423.13 (BAT)Arsenic, total (µg/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to surface water existing sources (BAT) (A) Where such unit has permanently ceased coal combustion by December 31, 2034, the quantity of pollutants in combustion residual leachate shall not exceed the quantity determined by multiplying the flow of combustion residual leachate times the concentration listed in table 11 to this paragraph (l)(2)(i)(A) by a date determined by the permitting authority that is as soon as possible beginning… table: Table 11 to paragraph (l)(2)(i)(A) | as above |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to surface water existing sources (BAT) (iii) For combustion residual leachate discharged from any coal combustion residual surface impoundment which commences closure pursuant to 40 CFR 257.102(e) after July 8, 2024, the quantity of pollutants in combustion residual leachate shall not exceed the quantity determined by multiplying the flow of combustion residual leachate times the concentration listed in table 12 to this paragraph (l… table: Table 12 to Paragraph (l)(2)(iii) | as above |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 4 µg/L | daily maximum | discharge to surface water new sources (NSPS) (13) FGD wastewater. The quantity of pollutants discharged in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in the following table: | 40 CFR 423.15 (NSPS)Arsenic, total (ug/L) 4 |
| Arsenic, total | 4 µg/L | daily maximum | discharge to surface water new sources (NSPS) (15) Gasification wastewater. The quantity of pollutants discharged in gasification wastewater shall not exceed the quantity determined by multiplying the flow of gasification wastewater times the concentration listed in the following table: | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to surface water new sources (NSPS) (16) Combustion residual leachate. The quantity of pollutants discharged in combustion residual leachate shall not exceed the quantity determined by multiplying the flow of combustion residual leachate times the concentration listed in the following table: | 40 CFR 423.15 (NSPS)Arsenic, total (ug/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 18 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (e) FGD wastewater —(1) 2020 PSES. Except as provided for in paragraph (e)(2) of this section, for any electric generating unit with a total nameplate generating capacity of more than 50 megawatts, that is not an oil-fired unit, and that the owner has not certified that it will cease coal combustion pursuant to § 423.19(g), the quantity of pollutants in FGD wastewater shall not exceed the quant… table: Table 3 to Paragraph (e)(1) | 40 CFR 423.16 (PSES)Arsenic, total (µg/L) 18 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (ii) If any low utilization electric generating unit fails to timely recertify that the two year average capacity utilization rating of such an electric generating unit is below 10 percent per year as specified in § 423.19(f), regardless of the reason, within two years from the date such a recertification was required, the quantity of pollutants in FGD wastewater shall not exceed the quantity d… table: Table 4 to Paragraph (e)(2)(ii) | 40 CFR 423.16 (PSES)Arsenic, total (µg/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (ii) For FGD wastewater discharged from any coal combustion residual surface impoundment which commences closure pursuant to 40 CFR 257.102(e) after July 8, 2024, the quantity of pollutants in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in the table 5 to this paragraph (e)(4)(ii). table: Table 5 to Paragraph (e)(4)(ii) | as above |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (ii) For bottom ash transport water discharged from any coal combustion residual surface impoundment which commences closure pursuant to 40 CFR 257.102(e) after July 8, 2024, the quantity of pollutants in bottom ash transport water shall not exceed the quantity determined by multiplying the flow of bottom ash transport water times the concentration listed in table 6 to this paragraph (g)(4)(ii). table: Table 6 to Paragraph (g)(4)(ii) | as above |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 4 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (i) Gasification wastewater. For any electric generating unit with a total nameplate generating capacity of more than 50 megawatts and that is not an oil-fired unit, the quantity of pollutants in gasification wastewater shall not exceed the quantity determined by multiplying the flow of gasification wastewater times the concentration listed in the table following this paragraph (i). Dischargers… | 40 CFR 423.16 (PSES)Arsenic, total (µg/L) 4 |
| Arsenic, total | 11 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (A) Where such unit has permanently ceased coal combustion by December 31, 2034, the quantity of pollutants in combustion residual leachate shall not exceed the quantity determined by multiplying the flow of combustion residual leachate times the concentration listed in the table 7 to this paragraph (j)(2)(i)(A) no later than April 30, 2035. table: Table 7 to paragraph (j)(2)(i)(A) | 40 CFR 423.16 (PSES)Arsenic, total (µg/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to a sewer (pretreatment) existing sources (PSES) (ii) For combustion residual leachate discharged from any coal combustion residual surface impoundment which commences closure pursuant to 40 CFR 257.102(e) after July 8, 2024, the quantity of pollutants in combustion residual leachate shall not exceed the quantity determined by multiplying the flow of combustion residual leachate times the concentration listed in table 8 to this paragraph (j)(… table: Table 8 to Paragraph (j)(2)(ii) | as above |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |
| Arsenic, total | 4 µg/L | daily maximum | discharge to a sewer (pretreatment) new sources (PSNS) (6) FGD wastewater. The quantity of pollutants discharged in FGD wastewater shall not exceed the quantity determined by multiplying the flow of FGD wastewater times the concentration listed in the following table: | 40 CFR 423.17 (PSNS)Arsenic, total (µg/L) 4 |
| Arsenic, total | 4 µg/L | daily maximum | discharge to a sewer (pretreatment) new sources (PSNS) (9) Gasification wastewater. The quantity of pollutants discharged in gasification wastewater shall not exceed the quantity determined by multiplying the flow of gasification wastewater times the concentration listed in the following table: | as above |
| Arsenic, total | 11 µg/L | daily maximum | discharge to a sewer (pretreatment) new sources (PSNS) (10) Combustion residual leachate. The quantity of pollutants discharged in combustion residual leachate shall not exceed the quantity determined by multiplying the flow of combustion residual leachate times the concentration listed in the following table: | 40 CFR 423.17 (PSNS)Arsenic, total (µg/L) 11 8 |
| Arsenic, total | 8 µg/L | monthly average | as above | as above |