Passage Data · Cited limits by place · Use it from your AI
24 numeric limits and guidelines for total suspended solids held for Canada–Newfoundland and Labrador offshore area and the place above it, from 6 instruments, each cited to its instrument, edition, section or page and quoted text. The register was built from 273 instruments. Everything held for Canada–Newfoundland and Labrador offshore area
The address: https://passage-data.com/mcp
In a chat app
In a coding tool
claude mcp add --transport http passage-data https://passage-data.com/mcp codex mcp add passage-data --url https://passage-data.com/mcp gemini mcp add --transport http passage-data https://passage-data.com/mcp Then ask it, for example: “What are the total suspended solids limits in Canada–Newfoundland and Labrador offshore area? Cite each one.”
For programs: this page as JSON at /api/v1/limits?parameter=total%20suspended%20solids&place=CA.nl_offshore_area; the same at https://passage-data.com/mcp, a remote MCP server (tool find_limits). Every tool · llms.txt · OpenAPI
The one instrument we hold for Canada–Newfoundland and Labrador offshore area (CA.nl_offshore_area) has no row for total suspended solids. The rows below are from the place above it, which we search too.
| Parameter | Value | Unit | Statistic | Governs | Applies when | Cite |
|---|---|---|---|---|---|---|
| Suspended Solids | 15.00 mg/L | mg/L | monthly average | effluent · limit | cites: MDMER route: direct a metal mine (or, since June 1, 2018, a diamond mine) whose final discharge points deposit more than 50 m3 of effluent per day (s. 2(1)) a mine to which the Regulations apply for the first time on or after June 1, 2021, or a recognized closed mine that returns to commercial operation on or after that day (s. 4(1)(a)(i)) | Metal and Diamond Mining Effluent Regulations (SOR/2002-222) Schedule 4, Table 1 — Column 2: maximum authorized monthly mean concentration 6 Zinc 0.40 mg/L 0.60 mg/L 0.80 mg/L 7 Suspended Solids 15.00 mg/L 22.50 mg/L 30.00 mg/L |
| Suspended Solids | 22.50 mg/L | mg/L | composite sample | effluent · limit | cites: MDMER route: direct a metal mine (or, since June 1, 2018, a diamond mine) whose final discharge points deposit more than 50 m3 of effluent per day (s. 2(1)) a mine to which the Regulations apply for the first time on or after June 1, 2021, or a recognized closed mine that returns to commercial operation on or after that day (s. 4(1)(a)(i)) | Metal and Diamond Mining Effluent Regulations (SOR/2002-222) Schedule 4, Table 1 — Column 3: maximum authorized concentration in a composite sample 6 Zinc 0.40 mg/L 0.60 mg/L 0.80 mg/L 7 Suspended Solids 15.00 mg/L 22.50 mg/L 30.00 mg/L |
| Suspended Solids | 30.00 mg/L | mg/L | instantaneous | effluent · limit | cites: MDMER route: direct a metal mine (or, since June 1, 2018, a diamond mine) whose final discharge points deposit more than 50 m3 of effluent per day (s. 2(1)) a mine to which the Regulations apply for the first time on or after June 1, 2021, or a recognized closed mine that returns to commercial operation on or after that day (s. 4(1)(a)(i)) | Metal and Diamond Mining Effluent Regulations (SOR/2002-222) Schedule 4, Table 1 — Column 4: maximum authorized concentration in a grab sample 6 Zinc 0.40 mg/L 0.60 mg/L 0.80 mg/L 7 Suspended Solids 15.00 mg/L 22.50 mg/L 30.00 mg/L |
| Suspended Solids | 15.00 mg/L | mg/L | monthly average | effluent · limit | cites: MDMER route: direct a metal mine (or, since June 1, 2018, a diamond mine) whose final discharge points deposit more than 50 m3 of effluent per day (s. 2(1)) any other mine (s. 4(1)(a)(ii)) | Metal and Diamond Mining Effluent Regulations (SOR/2002-222) Schedule 4, Table 2 — Column 2: maximum authorized monthly mean concentration 6 Zinc 0.50 mg/L 0.75 mg/L 1.00 mg/L 7 Suspended Solids 15.00 mg/L 22.50 mg/L 30.00 mg/L |
| Suspended Solids | 22.50 mg/L | mg/L | composite sample | effluent · limit | cites: MDMER route: direct a metal mine (or, since June 1, 2018, a diamond mine) whose final discharge points deposit more than 50 m3 of effluent per day (s. 2(1)) any other mine (s. 4(1)(a)(ii)) | Metal and Diamond Mining Effluent Regulations (SOR/2002-222) Schedule 4, Table 2 — Column 3: maximum authorized concentration in a composite sample 6 Zinc 0.50 mg/L 0.75 mg/L 1.00 mg/L 7 Suspended Solids 15.00 mg/L 22.50 mg/L 30.00 mg/L |
| Suspended Solids | 30.00 mg/L | mg/L | instantaneous | effluent · limit | cites: MDMER route: direct a metal mine (or, since June 1, 2018, a diamond mine) whose final discharge points deposit more than 50 m3 of effluent per day (s. 2(1)) any other mine (s. 4(1)(a)(ii)) | Metal and Diamond Mining Effluent Regulations (SOR/2002-222) Schedule 4, Table 2 — Column 4: maximum authorized concentration in a grab sample 6 Zinc 0.50 mg/L 0.75 mg/L 1.00 mg/L 7 Suspended Solids 15.00 mg/L 22.50 mg/L 30.00 mg/L |
| Total Suspended Matter | 1.2 kg/tonne of finished product | kg/tonne of finished product | daily maximum | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a red meat integrated plant: slaughters and dresses meat other than poultry (s. 2(1)) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Red Meat Integrated Plant — Column III: authorized actual daily deposit (s. 5(a)) Total Suspended Matter 1.2 kg/tonne of finished product 0.6 kg/tonne of finished product |
| Total Suspended Matter | 0.6 kg/tonne of finished product | kg/tonne of finished product | monthly average | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a red meat integrated plant: slaughters and dresses meat other than poultry (s. 2(1)) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Red Meat Integrated Plant — Column IV: authorized average daily deposit over an equivalent month (s. 5(b)) Total Suspended Matter 1.2 kg/tonne of finished product 0.6 kg/tonne of finished product |
| Total Suspended Matter | 0.5 kg/tonne of finished product | kg/tonne of finished product | daily maximum | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a processing plant (Schedule I, Column I) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Processing Plant — Column III: authorized actual daily deposit (s. 5(a)) Total Suspended Matter 0.5 kg/tonne of finished product 0.25 kg/tonne of finished product |
| Total Suspended Matter | 0.25 kg/tonne of finished product | kg/tonne of finished product | monthly average | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a processing plant (Schedule I, Column I) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Processing Plant — Column IV: authorized average daily deposit over an equivalent month (s. 5(b)) Total Suspended Matter 0.5 kg/tonne of finished product 0.25 kg/tonne of finished product |
| Total Suspended Matter | 1.0 kg/tonne of finished product | kg/tonne of finished product | daily maximum | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a poultry integrated plant (Schedule I, Column I) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Poultry Integrated Plant — Column III: authorized actual daily deposit (s. 5(a)) Total Suspended Matter 1.0 kg/tonne of finished product 0.5 kg/tonne of finished product |
| Total Suspended Matter | 0.5 kg/tonne of finished product | kg/tonne of finished product | monthly average | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a poultry integrated plant (Schedule I, Column I) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Poultry Integrated Plant — Column IV: authorized average daily deposit over an equivalent month (s. 5(b)) Total Suspended Matter 1.0 kg/tonne of finished product 0.5 kg/tonne of finished product |
| Total Suspended Matter | 0.4 kg/tonne of raw material | kg/tonne of raw material | daily maximum | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a rendering plant: solely edible or inedible rendering of meat or poultry products (s. 2(1)) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Rendering Plant — Column III: authorized actual daily deposit (s. 5(a)) Total Suspended Matter 0.4 kg/tonne of raw material 0.2 kg/tonne of raw material |
| Total Suspended Matter | 0.2 kg/tonne of raw material | kg/tonne of raw material | monthly average | effluent · limit | cites: Meat and Poultry Products Plant Liquid Effluent Regulations route: direct a new plant (commercial production from March 31, 1977) or an expanded plant (s. 3; s. 2(1)) a rendering plant: solely edible or inedible rendering of meat or poultry products (s. 2(1)) | Meat and Poultry Products Plant Liquid Effluent Regulations (C.R.C., c. 818) Schedule I, Rendering Plant — Column IV: authorized average daily deposit over an equivalent month (s. 5(b)) Total Suspended Matter 0.4 kg/tonne of raw material 0.2 kg/tonne of raw material |
| Total Suspended Matter | 2.1 kg/tonne of raw potatoes processed | kg/tonne of raw potatoes processed | daily maximum | effluent · limit | cites: Potato Processing Plant Liquid Effluent Regulations route: direct a new plant (commercial production from June 27, 1977) or an expanded plant (s. 3; s. 2(1)) a potato chip plant (Schedule I, Column I) | Potato Processing Plant Liquid Effluent Regulations (C.R.C., c. 829) Schedule I, Potato Chip Plant — Column III: authorized actual daily deposit (s. 5(a)) Total Suspended Matter 2.1 kg/tonne of raw potatoes processed 0.7 kg/tonne of raw potatoes processed |
| Total Suspended Matter | 0.7 kg/tonne of raw potatoes processed | kg/tonne of raw potatoes processed | monthly average | effluent · limit | cites: Potato Processing Plant Liquid Effluent Regulations route: direct a new plant (commercial production from June 27, 1977) or an expanded plant (s. 3; s. 2(1)) a potato chip plant (Schedule I, Column I) | Potato Processing Plant Liquid Effluent Regulations (C.R.C., c. 829) Schedule I, Potato Chip Plant — Column IV: authorized average daily deposit during a month (s. 5(b)) Total Suspended Matter 2.1 kg/tonne of raw potatoes processed 0.7 kg/tonne of raw potatoes processed |
| Total Suspended Matter | 2.4 kg/tonne of raw potatoes processed | kg/tonne of raw potatoes processed | daily maximum | effluent · limit | cites: Potato Processing Plant Liquid Effluent Regulations route: direct a new plant (commercial production from June 27, 1977) or an expanded plant (s. 3; s. 2(1)) an other potato products plant: canned, dehydrated, frozen potato products or potato starch (Schedule I note) | Potato Processing Plant Liquid Effluent Regulations (C.R.C., c. 829) Schedule I, Other Potato Products Plants — Column III: authorized actual daily deposit (s. 5(a)) Total Suspended Matter 2.4 kg/tonne of raw potatoes processed 0.8 kg/tonne of raw potatoes processed |
| Total Suspended Matter | 0.8 kg/tonne of raw potatoes processed | kg/tonne of raw potatoes processed | monthly average | effluent · limit | cites: Potato Processing Plant Liquid Effluent Regulations route: direct a new plant (commercial production from June 27, 1977) or an expanded plant (s. 3; s. 2(1)) an other potato products plant: canned, dehydrated, frozen potato products or potato starch (Schedule I note) | Potato Processing Plant Liquid Effluent Regulations (C.R.C., c. 829) Schedule I, Other Potato Products Plants — Column IV: authorized average daily deposit during a month (s. 5(b)) Total Suspended Matter 2.4 kg/tonne of raw potatoes processed 0.8 kg/tonne of raw potatoes processed |
| Suspended solids | Q d = F × 2.5 × RPR, F = 7.5 kg/t | kg per tonne of finished product (× the mill's reference production rate RPR, t/d) | daily maximum | effluent · limit | cites: PPER route: direct unless an authorization has been issued authorizing the deposit of BOD matter or suspended solids (s. 14) | Pulp and Paper Effluent Regulations (SOR/92-269) — s. 14 maximum BOD and suspended solids s. 14(a) (a) in respect of a daily period, the amounts determined using the formula Q d = F × 2.5 × RPR |
| Suspended solids | Q m = F × D × 1.5 × RPR, F = 7.5 kg/t | kg per tonne of finished product (× the mill's reference production rate RPR, t/d) | monthly average | effluent · limit | cites: PPER route: direct unless an authorization has been issued authorizing the deposit of BOD matter or suspended solids (s. 14) | Pulp and Paper Effluent Regulations (SOR/92-269) — s. 14 maximum BOD and suspended solids s. 14(b) (b) in respect of a month, the amounts determined using the formula Q m = F × D × 1.5 × RPR |
| Total Suspended Matter | 7.2 | lb per 1,000 barrels of crude oil (× the refinery's reference crude rate) | monthly average | effluent · limit | cites: PRLER route: direct | Petroleum Refinery Liquid Effluent Regulations (C.R.C., c. 828) — Schedule I authorized deposits Schedule I, Column II: monthly amount (the month's mean of daily authorized deposits, s. 7) 5 Total Suspended Matter 7.2 12.0 15.0 |
| Total Suspended Matter | 12.0 | lb per 1,000 barrels of crude oil (× the refinery's reference crude rate) | effluent · limit | cites: PRLER route: direct the actual deposit may exceed it on no more than one day in each month (s. 5(1)(b)) | Petroleum Refinery Liquid Effluent Regulations (C.R.C., c. 828) — Schedule I authorized deposits Schedule I, Column III: one day amount — not exceeded on more than one day in a month (s. 8(1)) 5 Total Suspended Matter 7.2 12.0 15.0 | |
| Total Suspended Matter | 15.0 | lb per 1,000 barrels of crude oil (× the refinery's reference crude rate) | daily maximum | effluent · limit | cites: PRLER route: direct | Petroleum Refinery Liquid Effluent Regulations (C.R.C., c. 828) — Schedule I authorized deposits Schedule I, Column IV: maximum daily amount (s. 8(2)) 5 Total Suspended Matter 7.2 12.0 15.0 |
| Suspended solids | 25 mg/L | mg/L | effluent · limit | stream: sanitary route: direct zone: not CA-NT, CA-NU, CA.qc_nl_north_of_54 a wastewater system designed to collect, or collecting in a calendar year, an average daily volume of 100 m3 or more of influent (s. 2(1)); not one on an industrial site whose influent is less than 50% blackwater and greywater (s. 2(4)) | Wastewater Systems Effluent Regulations (SOR/2012-139) — s. 6 effluent quality s. 6(1) (b) the average concentration of suspended solids in the effluent did not exceed 25 mg/L |
Not held here: a discharge permit's own limits, and any rule for total suspended solids outside the 13 instruments we hold for this place and the places above it. A row missing here is missing from our sources, not from the law.
Free check: send your permit or your lab results, and we check each number against these rows, every verdict cited to its page, by email within 5 business days. Or send the link to a rule we do not hold: we read it and cite it by page.
Every instrument we hold for Canada–Newfoundland and Labrador offshore area (CA.nl_offshore_area) and the place above it, Canada (CA): 13 instruments, for every parameter name matching “total suspended solids”: total suspended solids, residue non filterable total suspended solids.
c60e2a2dfa9a10c2ddd314b391bf66215ad599732f38b4c5a15fe793d8c28841 — 8 rows here2c6e0151d3776378f73df4868ca98052882ee81faf9738bbeba6f5d544b648fe — 6 rows here691ca3953a6dd6ae66b4c72737944caa68ed76710447df642a16716dd25027a3 — 4 rows here30e528bdc3a3546afb3defff4dae9b1dacb362e192680e127bd788d7f97c8ce8 — 3 rows herecc8432e6a4dd1834ff4dd43d5b5fb98f09b1f7af7952e36154febcc649504eb4 — 2 rows here0a60e10f783f7aca672792303dffcca1525133eb34eb32711543cb3cf4bbb955 — 1 row heref484a5f2a2dfcb5a4257763c853fc8dc810788cec54c75355b30ec194e2f7499 — no row heref484a5f2a2dfcb5a4257763c853fc8dc810788cec54c75355b30ec194e2f7499 — no row heredb95b0a149728b0f0b1e1b1314d87ecdf46a91e1edfec4a7006fc3cbe0080bd6 — no row here9451ad8bfa566c0625ae4fcb362272cbb0e20040c548540f362488118c300b89 — no row here32a42a0d382cdd90729dd9750f47889782bd00d4af8dfd34f2b9aaf6f2678c6c — no row hereb0b2bca759a406484e14f25626d7c58358fbc45e037bb613e11d222d42af5215 — no row hereRead from public law and public agency files. A row missing here is missing from our sources, not from the law of the place. Check the cited source before relying on a value.