Heavy Construction — NPDES discharge permits in West Virginia

Of the 3 permits in EPA's SIC 16 in WV, 1 went over a limit between 2025-10-01 and 2026-09-30 (Aluminum, total recoverable: 1; Iron, total recoverable: 1; Zinc, total recoverable: 1). 1 is past the expiry date EPA's file holds; 2 have a renewal application overdue or due within 18 months. EPA's file of 2026-10-15.

FacilityLast 12 monthsPermit
LITMAN EXCAVATING, INC.
WV0117471 · Water, Sewer, And Utility Lines
Over a limit 15×: Aluminum, total recoverable (7×), Iron, total recoverable (3×), Zinc, total recoverable (2×)Renewal application due Mar 9, 2027
BRAYMAN CONSTRUCTION CORPORATION
WV0117862 · Heavy Construction
No value over a limitRenewal application overdue
WV DIVISION OF HIGHWAYS
WV0116670 · Heavy Construction
No value over a limit; 52 required values not reportedPermit past the expiry date EPA's file holds

The record is EPA's ICIS-NPDES file of 2026-10-15: values filed against each limit between Oct 1, 2025 and Sep 30, 2026. No reports on file may be EPA's gap, not the facility's.