Passage Data · Check a report · Use it from your AI
1 plant already has a new or tighter limit for Boron, dissolved [as B] in its permit, taking effect Oct 1, 2027 (1 limit). It did not report a median above that limit between Oct 1, 2025 and Sep 30, 2026. EPA's file of Oct 16, 2026.
| Plant | New limit | Effective | Median, last 12 months | × limit |
|---|---|---|---|---|
| El Paso Electric · NM0000108 · NM Industrial | 30-day average 3.72 lb/d, new | Oct 1, 2027 | 3.56 lb/d (3 values) | 0.957× |
New: a limit on something the outfall was never limited on. Tighter: lower than the limit in force. Median: the plant's own reports, Oct 1, 2025 to Sep 30, 2026; none where most were below detection.
For sellers: get this list every week (what you get), or write to info@passage-data.com.
Read the permit before relying on a value. Source: EPA ECHO, Oct 16, 2026. As JSON: /api/v1/permits?state=OH&upcoming=true · MCP: https://passage-data.com/mcp