Passage Data · Check a report · Use it from your AI
In Indiana, for Selenium, total recoverable: 5 plants hold a permit with a new or tighter discharge limit already written into it, taking effect between Jun 1, 2028 and Oct 1, 2029 (13 limits); 4 of them reported a median above that limit between Oct 1, 2025 and Sep 30, 2026. EPA's file of Oct 16, 2026.
By state: all · OH 8 · IN 5 · MO 1 · SD 1 · WV 1
By pollutant: all · Toxicity [acute], Ceriodaphnia dubia 8 · Toxicity [acute], Pimephales promelas [Fathead Minnow] 8 · Toxicity [chronic], Ceriodaphnia dubia 8 · Toxicity [chronic], Pimephales promelas [Fathead Minnow] 7 · Nitrogen, ammonia total [as N] 6 · Phosphorus, total [as P] 6 · Selenium, total recoverable 5 · Zinc, total recoverable 5 · Cyanide, free [as free] 4 · Lead, total recoverable 3 · Cadmium, total recoverable 2 · Chloride [as Cl] 2 · Nickel, total recoverable 2 · Silver total recoverable 2 · Solids, total suspended 2 · Arsenic, total recoverable 1 · BOD, carbonaceous [5 day, 20 C] 1 · Boron, total recoverable 1 · Bromide [as Br] 1 · Copper, total recoverable 1 · Cyanide, total recoverable 1 · E. coli, colony forming units [CFU] 1 · Fluoride, total [as F] 1 · Manganese, total recoverable 1 · Mercury, total recoverable 1
| Plant | Permit | State | Type | Design flow | Parameter | New limit | Effective | Today's median | × limit |
|---|---|---|---|---|---|---|---|---|---|
| IPALCO - PETERSBURG GEN STATION | IN0002887 | IN | Industrial, major | 340 MGD | Selenium, total recoverable | monthly average 0.0031 mg/L, tighter | Jun 1, 2028 | 0.0065 mg/L (11 values) | 2.1× |
| IPALCO - PETERSBURG GEN STATION | IN0002887 | IN | Industrial, major | 340 MGD | Selenium, total recoverable | monthly average 0.0031 mg/L, tighter | Jun 1, 2028 | 0.0045 mg/L (11 values) | 1.45× |
| IPALCO - PETERSBURG GEN STATION | IN0002887 | IN | Industrial, major | 340 MGD | Selenium, total recoverable | daily maximum 0.0075 mg/L, tighter | Jun 1, 2028 | 0.01 mg/L (11 values) | 1.33× |
| DUKE ENERGY INDIANA CAYUGA GENERATING STATION | IN0002763 | IN | Industrial, major | — | Selenium, total recoverable | daily maximum 10 ug/L, new | Jan 1, 2029 | 210 ug/L (11 values) | 21× |
| INDIANAPOLIS BELMONT & SOUTHPORT AWTP | IN0023183 | IN | Sewage plant, major | 125 MGD | Selenium, total recoverable | monthly average 0.0031 mg/L, new | May 1, 2029 | 0.0049 mg/L (11 values) | 1.58× |
| AMERICAN ELECTRIC POWER, ROCKPORT PLANT | IN0051845 | IN | Industrial, major | — | Selenium, total recoverable | monthly average 0.0031 mg/L, tighter | Oct 1, 2029 | 0.0225 mg/L (5 values, 2 below detection) | 7.26× |
| AMERICAN ELECTRIC POWER, ROCKPORT PLANT | IN0051845 | IN | Industrial, major | — | Selenium, total recoverable | daily maximum 0.0075 mg/L, tighter | Oct 1, 2029 | 0.0225 mg/L (5 values, 2 below detection) | 3× |
| IPALCO - PETERSBURG GEN STATION | IN0002887 | IN | Industrial, major | 340 MGD | Selenium, total recoverable | daily maximum 0.0075 mg/L, tighter | Jun 1, 2028 | 0.005 mg/L (11 values) | 0.667× |
| INDIANAPOLIS BELMONT & SOUTHPORT AWTP | IN0023183 | IN | Sewage plant, major | 125 MGD | Selenium, total recoverable | daily maximum 0.0075 mg/L, new | May 1, 2029 | 0.0071 mg/L (11 values) | 0.947× |
| GOSHEN WWTP | IN0025755 | IN | Sewage plant, major | 5 MGD | Selenium, total recoverable | daily maximum 0.0075 mg/L, new | Jul 1, 2029 | under 3 values | — |
| GOSHEN WWTP | IN0025755 | IN | Sewage plant, major | 5 MGD | Selenium, total recoverable | daily maximum 0.31 lb/d, new | Jul 1, 2029 | under 3 values | — |
| GOSHEN WWTP | IN0025755 | IN | Sewage plant, major | 5 MGD | Selenium, total recoverable | monthly average 0.13 lb/d, new | Jul 1, 2029 | under 3 values | — |
| GOSHEN WWTP | IN0025755 | IN | Sewage plant, major | 5 MGD | Selenium, total recoverable | monthly average 0.0031 mg/L, new | Jul 1, 2029 | under 3 values | — |
Each limit is one EPA's ICIS-NPDES file holds on the permit's current version with a begin date after today, enforceable and numeric, either on a parameter the outfall was never limited on (new) or lower than the limit in force (tighter). Today's median is the plant's own reported values for the same outfall, statistic and unit between Oct 1, 2025 and Sep 30, 2026, with how many; none is shown where most were below a detection limit. Read the permit before relying on a value.
Sell to these plants? The list for your states every week, with every plant over a limit on your pollutant, as a spreadsheet, by API and by email when a new one appears: ask for the plant list, or write to info@passage-data.com. What a seller gets.
For programs and AI agents: a state's permits with these limits as JSON at /api/v1/permits?state=IN&upcoming=true, narrowed with &facility_type=potw or &min_flow_mgd=1; the whole list at /dmr/data/upcoming.json; or add https://passage-data.com/mcp as a remote MCP server (tool list_permits). Free, no key. llms.txt
From EPA's ECHO data, not the permit document itself: your permit is the final word. All states