Passage Data · Check a report · Use it from your AI
1 plant already has a new or tighter limit for Sulfide, dissolved, [as S] in its permit, taking effect Aug 1, 2027 (8 limits). It did not report a median above that limit between Oct 1, 2025 and Sep 30, 2026. EPA's file of Oct 16, 2026.
| Plant | New limit | Effective | Median, last 12 months | × limit |
|---|---|---|---|---|
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 19 lb/d (Oct, Nov), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 400 ug/L (Oct, Nov), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 370 ug/L (Jan, Feb, Mar, Dec), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 18 lb/d (Jan, Feb, Mar, Dec), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 410 ug/L (Apr), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 20 lb/d (Apr), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 490 ug/L (May–Sep), new | Aug 1, 2027 | — | — |
| DTE Electric Company · MI0001953 · MI Industrial, major | daily maximum 23 lb/d (May–Sep), new | Aug 1, 2027 | — | — |
New: a limit on something the outfall was never limited on. Tighter: lower than the limit in force. Median: the plant's own reports, Oct 1, 2025 to Sep 30, 2026; none where most were below detection.
For sellers: get this list every week (what you get), or write to info@passage-data.com.
Read the permit before relying on a value. Source: EPA ECHO, Oct 16, 2026. As JSON: /api/v1/permits?state=OH&upcoming=true · MCP: https://passage-data.com/mcp